Whitingham Middle School Woodship Heating Plant
Location: Whitingham, VT
Architect: Banwell Architects
Contract Amount: $807,201
Ingram Construction teamed with Banwell Architects to construct a new woodchip heating plant for the Whitingham VT Middle School. This building houses a massive hydronic boiler and chip storage bunker that make up the fully automated system. The building is remote from the main school building, so new 8” diameter direct burial jacketed heat mains were run into the existing mechanical room and tied into the existing oil fired system. A new control system was added and integrated with the existing building energy management system.